info@liderorg.in +91 9163604924 +91 8375085055

About Us - Leaders in Biomethane and Biogas Solutions

At Liderorg Tech, we specialize in Biomethane and Biogas solutions, creating sustainable, asset-generating projects with disciplined scaling, profitability, and lasting environmental impact. We also have first mover advantage in our technology.

About Liderorg Tech - Biomethane and Biogas Experts

Vision and Mission

Our Mission is to provide the existing and upcoming investors/ entrepreneurs in the field of Bio-methanation with a unit which is Economically viable even without external subsidy, have very low revenue leakage, have minimum electricity consumption, minimum breakdown and maintenance, high operating margin.

  • Organization headed by two engineers with 8+ year of experience in Bio-methanation field and under guidance of advisory pane; with 28+ years of experience in Renewable Energy/ Waste to Energy field.
  • With world class manufacturing infrastructure and design team, A team that believes in practical innovation that helps the common people and environment.

We are a team of dedicated engineers, Designers, and On-ground Executives. We provide 0-1 Turnkey Solutions/ Customized Solutions/ Machinery/ Gas Storage devices and much more

01

Economically Sustainable

While the traditional plants become sustainable only after incorporating subsidy, Our plants are economically sustainable on its own thanks to low cost and high operating margin. Subsidy becomes supplementary instead of complimentary.

02

Minimum Revenue Leakage

Majority of installed and upcoming plants use PSA. In order to counter high (10 -20%) methane loss, the cost and electrical load of PSA increases. While our PATENT PENDING purification system have less than 1% methane loss.

03

High Operating Margin

Traditional Plants use CSTR digester which are known for high electricity consumption and complex repair and maintenance. Our MCMF uses zero electricity and requires very little to no maintenance, saving up-to 90% of electrical and repair/maintenance cost

04

Quick Installation

Due to on-site assembly nature and little civil work, the plant gets commissioned within 2-3 months

05

Quick Payback

Since our plant is low cost, have minimum revenue leakage, low electricity consumption, minimal breakdown, the payback period of our plant is just 1-2 years

06

Quick/ hassle free installations

Our Machinery are plug and play and Digester are on site assembled that takes less than 30 days to install with minimum civil work, that too with 5 year warranty and 15+ year life

Trusted by Clients for Biogas and Biomethane Solutions

With client list that includes government, MNCs, NGOs, Universities and much more

Engineering India Limited - Our Client in Biogas Projects
Logo of Rajasthan Government,Our Client
Logo of ITC Limited,Our Client
Logo of Nestle Logo,Our Client
Logo of West Bengal Government,Our Client
Logo of Bikaji Foods International Limited,Our Client
Logo of Nidan NGO,Our Client
Logo of Asha Kiran NGO,Our Client
Logo of EE,Our Client
Logo of J Parekh,Our Client
Logo of JIMS University,Our Client
Logo of KRMU,Our Client
Logo of Santosh University,Our Client
Logo of Staartek,Our Client
Logo of Bikanervala,Our Client
Logo of Galgotia,Our Client
Logo of Genial Infratech,Our Client

Industry Leaders Partnering for Biogas and Biomethane Innovation

We are partnered with Industry leaders

Logo of Airpoll Technologies, Our Partner
Logo of SP Eco Fuel, Our Partner
Logo of EECG Industrial Solutions Private Limited,Our Partner
Logo of IPICON Engineering, Our Partner

Product and Services

OEM in the of Biomethanation field

Biogas Plants

Our product range include home based small plants, medium scales Biogas plants, Biogas Power plants, Biomethanation plants, On-site Assembled Digester, Large scale Biogas Power/ Heat/ CHP/ CBG plants

EPC CBG/ Power Plant Installation

From initial documentation till the project handover, we are with you on every step.

Gas Storage

Best quality, fire proof, UV coated PVC coated fabric gas storage. 0.5 Lakhs+ gas balloons already in market, production capacity of 1,000 cubic meter/day we are happy to help you. We also provide MS based gas storage

Biogas Up-gradation Unit

Our patent pending Biogas Purification units that can achieve less than 1% methane loss. Carbon Dioxide and Hydrogen Sulphide removal skid mounted purification units with option to control output pressure between 1 mbar to 12 bars

Instrumentation and Control

Flow-meters, Overpressure release, Balloon Safety Valves, Analyzers, Sensors, Pressure Transducers, RTDs, etc.

Other

Plant restart, repair, DPR, PESO approval, Subsidy approval, P & IDs, GA Drawing, HAZOP & HAZID approved machines

Call To Action

Request a proposal now!

Projects

Our project portfolio consists of micro biogas plants to large scale CBG plants.

  • All
  • Purification Units
  • CBG Units
  • On-site Assembled MCMF Biogas Plants
  • Biogas Power and Fuel Distribution Plants
  • Home Based Biogas Plants
  • Balloons
  • Other Products
  • Ongoing Projects
Patent pending technology based Biogas Purification Machinery ready for Dispatch, at the Fabrication Site

250 cubic meter per hour Biogas Purification System

In our factory, ready to dispatch

An MCMF Technology based Biogas Digester that is part of a biogas purification plant installed on a Dairy Farm, Location: Anand, Gujarat

10 TPD waste based Biogas Purification Plant

Installed in Gujarat

An On-Site Assembled MCMF Biogas Digester that is part of a biogas power plant installed on a Dairy Farm, Location: Sri Anupgarh, Sri Ganganagar, Rajasthan

270 cubic meter volume On-site Assembled MCMF Digester

Installed in Sri Ganganagar, Under Rajasthan Government

A Biogas Purification Machinery under fabrication, In Factory.

100 cubic meter per hour Biogas Purification System

In our factory, Undergoing Fabrication

A 3d model of home based biogas plant, model used for carbon foot print reduction and making the small homes and farmers self sufficient.

Model

Home Based Biogas Plant

A home based Biogas Plant working in a village in Haryana, this plant is used for making the farmer self sufficient as well as carbon foot print reduction.

Farm based Plant

Installed in Haryana

An onsite assembled digester plant installed in a University.

Food waste based On-site Assembled MCMF Digester

Installed in Jammu University, Jammu

A Fuel Distribution cum Biogas Power Plant under operation

Govardhan Project, Jharkhand Government

Biogas Purification System Version 2.0 product lineup

from 50 cubic meter per hour to 1000 cubic meter per hour!

Biogas Flow-meter

Installed on a purification site, Haryana.

400 cubic meter Biogas Power Plant

Installed in Sarsa, Gujarat

0.5 TPD CBG output plant based on ETP water

ETP to Biogas

200 cubic meters Biogas Balloon

Installed at Bikanervala Foods Private Limited, Sonipat

Food waste based On-site Assembled MCMF Digester

Installed in Sandeep University

50 cubic meter Balloon

In factory

Biogas Power Plant

Plant installed in Sharda University

20 cubic meter per hour Biogas Purification System

Under Operation, Ramkrishna Mission

family based plant: Underground type

While comparatively cheaper, requires pit to be installed.

200 kg CBG output CBG Plant

Sarsa, Gujarat

Food waste based On-site Assembled MCMF Digester

Installed in J S University, Sikohabad

Biogas Power cum Fuel Distribution Plant

Plant installed in Ma Shakumbhari Kanha Upvan Gaushala, Saharanpur Municipal Corporation, Under ITC Limited Sunehra Kal initiative

100 cubic meter per hour Biogas Purification System

Under Operation, Bikaji International, Bikaner, Rajasthan

200 cubic meters Biogas Balloon

Installed at Bikaji International Limited, Bikaner

50 KW Biogas Power Plant

Plant installed in AMUL, Anand, Gujarat

250 cubic meter per hour Biogas Purification System

In our factory, Undergoing final inspection

150 cubic meter volume On-site Assembled MCMF Digester

Installed in West Bengal

Biogas Purification System Version 2.0

Something exciting is on the way!

Biogas Purification Plant

During Commissioning, Anand, Gujarat

family based plant: On-site Assembled Type

While twice the cost than underground type, Its more aesthetically pleasing and best suited for cities and professional environment.

1 TPD CBG output CBG cum Power (200 KW) Plant

Under construction in Bhopal, MP

Food waste based On-site Assembled MCMF Digester

Installed in Santosh University, Ghaziabad

50 cubic meter Balloon

Installed at Govardhan Site, Bihar Government

family based plant: Underground type

While comparatively cheaper, requires pit to be installed.

Mixers and Agitators

Installed on site, for making slurry.

Biogas Burners

Installed in gaushala, Rajasthan.

Biogas Flow-meter

Installed in community fuel distribution site, Bihar, Under Bihar Government.

Fertilizer Machine

Installed in Rajasthan, Under Rajasthan Government.

Team

A team that consists of Engineers with 29+ years of experience in Renewable Energy and Waste to Energy field

Avanish Pati Tripathi

Chief Technical Officer

B. Tech., Started working in Biogas Field in 2015. Oversees Project Design, Planning, Execution, development of new technologies, manufacturing aspect.

Prasant Jha

Chief Executive Officer

B. Tech., Started his career as Plant head of North India's first CBG unit in 2016. Oversees, Project Execution, Sales, Customer acquisition, Business Development aspect

Sanjay Patel

Mentor

With experience of 29+ years in Renewable Energy and WTE and a vision of making Indian farmers independent and free from perils the wood burning and the dangers that comes with it while giving them an alternate source of income. Sanjaybhai Patel has been a guiding light for Liderorg and Its team to overcome challenges and explore new horizon.

Tapas Sadhu

Senior Technical Business Development Officer

B. Tech., Oversees clients such as MNCs, government etc.

Debashis Gorey

Senior Executive Officer

Diploma, Oversees Customer relations and Project Execution

Contact

For any Waste to Energy, Bio-Methane, Green Hydrogen, Gas Sweetening, Gas Storage, Pressure Vessel related queries

Location:

Shree Krishna Square 7th Floor, Office No. 7M, 2A Grant Lane Kolkata WB 700012 IN

Call:

+91-9163604924 / 8375085055