An organization with experience heavy team that intends to revolutionize, innovate, and change the Bio-methanation and Purification sector...
Read MoreBiogas is a green and renewable source of energy which can be upgraded to Natural Gas grade (Green Methane or Bio-methane), which can replace any fossil fuel directly
The Biomethane obtained from anaerobic process can be further processed and converted to Green Hydrogen by any preexisting mature technologies
Biogas purification is used to upgrade the raw biogas to Pure Methane/ Bio-NG/ Upgraded Biogas that can be further compressed to 250 bars to make CBG/ Bio-CNG or processed to convert to Green Hydrogen
At Liderorg Tech, we specialize in Biomethane and Biogas solutions, creating sustainable, asset-generating projects with disciplined scaling, profitability, and lasting environmental impact. We also have first mover advantage in our technology.

Our Mission is to provide the existing and upcoming investors/ entrepreneurs in the field of Bio-methanation with a unit which is Economically viable even without external subsidy, have very low revenue leakage, have minimum electricity consumption, minimum breakdown and maintenance, high operating margin.
We are a team of dedicated engineers, Designers, and On-ground Executives. We provide 0-1 Turnkey Solutions/ Customized Solutions/ Machinery/ Gas Storage devices and much more.
Discover what makes us different
While the traditional plants become sustainable only after incorporating subsidy, Our plants are economically sustainable on its own thanks to low cost and high operating margin. Subsidy becomes supplementary instead of complimentary.
Majority of installed and upcoming plants use PSA. In order to counter high (10-20%) methane loss, the cost and electrical load of PSA increases. While our PATENT PENDING purification system have less than 1% methane loss.
Traditional Plants use CSTR digester which are known for high electricity consumption and complex repair and maintenance. Our MCMF uses zero electricity and requires very little to no maintenance, saving up-to 90% of electrical and repair/maintenance cost
Due to on-site assembly nature and little civil work, the plant gets commissioned within 2-3 months
Since our plant is low cost, have minimum revenue leakage, low electricity consumption, minimal breakdown, the payback period of our plant is just 1-2 years
Our Machinery are plug and play and Digester are on site assembled that takes less than 30 days to install with minimum civil work, that too with 5 year warranty and 15+ year life
With client list that includes government, MNCs, NGOs, Universities and much more
We are partnered with Industry leaders
OEM in Biomethanation, CBG, and Biogas Purification
Our product range include home based small plants, medium scales Biogas plants, Biogas Power plants, Biomethanation plants, On-site Assembled Digester, Large scale Biogas Power/ Heat/ CHP/ CBG plants
From initial documentation till the project handover, we are with you on every step.
Best quality, fire proof, UV coated PVC coated fabric gas storage. 0.5 Lakhs+ gas balloons already in market, production capacity of 1,000 cubic meter/day we are happy to help you. We also provide MS based gas storage
Our patent pending Biogas Purification units that can achieve less than 1% methane loss. Carbon Dioxide and Hydrogen Sulphide removal skid mounted purification units with option to control output pressure between 1 mbar to 12 bars
Flow-meters, Overpressure release, Balloon Safety Valves, Analyzers, Sensors, Pressure Transducers, RTDs, etc.
Plant restart, repair, DPR, PESO approval, Subsidy approval, P & IDs, GA Drawing, HAZOP & HAZID approved machines
Request a proposal now!
Our project portfolio consists of micro biogas plants to large scale CBG plants.

In our factory, ready to dispatch

Installed in Gujarat

Installed in Sri Ganganagar, Under Rajasthan Government

In our factory, Undergoing Fabrication

For carbon footprint reduction

Installed in Haryana

Installed in Sarsa, Gujarat

Installed at Bikanervala Foods Private Limited, Sonipat

Installed on a purification site, Haryana
A team that consists of Engineers with 29+ years of experience in Renewable Energy and Waste to Energy field
Chief Technical Officer
B. Tech., Co-founder and CTO at Liderorg, where he oversees the end-to-end engineering of biogas and CBG facilities, including the design of digesters and gas purification systems. Passionate about performance, efficiency, reliability and execution on the ground.
Chief Executive Officer
B. Tech., CEO and co-founder of Liderorg Tech Pvt. Ltd., overseeing the business strategy, client relationships, and project execution. Emphasis on creating strong relationships and providing efficient waste-to-energy solutions in various industries within the waste-to-energy domain.
Mentor
With experience of 29+ years in Renewable Energy and Waste to energy Sanjay Bhai Patel is the mentor, currently working with SP Eco Fuel. He has vast experience in decentralized biogas systems. Patel is instrumental in developing reliable solutions with his practical knowledge.
Senior Technical Officer
B. Tech., specializes in automation, instrumentation, and control systems for biogas and CBG plants. His work focuses on seamless integration of sensors, PLC-based systems, and process control to deliver reliable and optimized plant performance.
Senior Executive Officer
Diploma, Debashis Gorey is an important part of the operations team at Liderorg, assisting with client coordination, communication, and execution. He is responsible for ensuring proper communication, documentation, and execution of the projects undertaken.
0
YEARS OF EXPERIENCE
0
HAPPY CLIENTS
0
PRODUCTS IN MARKET
0
AROUND-THE-CLOCK SUPPORT
For any Waste to Energy, Bio-Methane, Green Hydrogen, Gas Sweetening, Gas Storage, Pressure Vessel related queries
Shree Krishna Square 2nd Floor, Room No. 2J, 2A Grant Lane Kolkata WB 700012 IN